CASE STUDIES

The De Ferrers Academy

Project details

Client: Affinity Learning Partnership

Site De Ferrers Academy, Trent Campus

Location: Burton, Staffordshire

Services: Heating

OUR CLIENT

Affinity Learning Partnership is a mixed multi-academy trust operating across Staffordshire and Derbyshire, comprising of three secondary schools and four primary schools.

One of their sites, The De Ferrers Academy in Burton upon Trent, is the largest school in Staffordshire, educating more than 2,450 students across three campuses. This project was carried out at the Trent Campus, which serves Years 9–11 and provides the learning environment for students preparing for their GCSE qualifications.

IN THE END

To minimise disruption to teaching and learning, our engineers completed the works during the school holidays.

The project began with the careful removal of the existing high-level redundant storage tank and hot water heater. Heating and water services were isolated, safely drained
down, and prepared for the replacement works. The existing Remeha gas-fired boilers, heating pumps and associated pipework were then disconnected and removed.

The gas installation was modified to accommodate a new Viessmann Vitodens 200-W four-boiler modular cascade system, complete with new flue and pipework. To maximise
heating performance, two new 184kW Alfa Laval plate heat exchangers were installed alongside new Grundfos heating pumps, fitted with flexible connectors and anti-vibration mounts to ensure efficient, reliable operation.

A new Trend IQ4 Building Management System (BMS) control panel was installed, together with new controls and BMS wiring, providing improved monitoring, control and energy management across the heating system.

The electrical installation was also comprehensively upgraded. Existing lighting, the distribution board, gas emergency systems, isolators and spurs were removed and replaced with new equipment, resulting in a fully modern plant room designed to support the new heating installation.

The De Ferrers Academy now benefits from a completely modern, energy-efficient heating system that provides reliable performance for years to come. By replacing ageing equipment with high-efficiency plant and intelligent controls, the school has improved system reliability, enhanced energy management and reduced the risk of unplanned downtime.

The flush out point. Their will be new T connection from blue pipe to bottom left corner.

PROJECT GALLERY

RELATED CASE STUDIES

Amey Community Ltd – HMP

Amey Community Ltd – HMP

CASE STUDIES Project details Client: Amey Community Ltd Site HMP  Location: Staffordshire Services: Heating Upgrade OUR CLIENT Our client operates a secure custodial facility where reliable heating and essential building services are vital to maintaining a safe,...

Sun Academy

Sun Academy

CASE STUDIES Project details Client: Academy Transformation Trust Site Sun Academy Location: Newcastle-under-Lyme Services: Heating Boiler ReplacementOUR CLIENT Our client, The Academy Transformation Trust, knows that providing the very best education for their...

Church Lawton School

Church Lawton School

CASE STUDIES Project details Client: Liberty Academy Trust Ltd Site Church Lawton School Location: Stoke-on-Trent Services: HeatingOUR CLIENT Liberty Academy Trust Ltd is an education charity committed to providing exceptional learning environments that enable every...

Contact Us

We’d love to chat with you.

Fill in the form below and one of our dedicated team members will get in touch.