CASE STUDIES

Fenton Health Centre – Boiler Upgrades

Project details

Client: Integral UK Ltd

Site: Fenton Health Centre

Location: Fenton, Stoke-on-Trent

Sector: Healthcare

Services: Mechanical Installation Services

OUR CLIENT

Integral UK Ltd is a leading mechanical, electrical, and fabric property maintenance business. One of their key sites, Fenton Health Centre, is a welcoming NHS facility serving patients from Fenton and the surrounding communities.

IN THE END

All works were carried out while the centre remained fully operational, with our team taking great care to minimise disruption to staff and patients. We supplied and installed two Bosch condensing heating boilers, along with the installation of a Bosch cascade boiler controller unit, seamlessly integrated into the existing BMS. In addition to the new boilers, we replaced the heating, gas, complete with thermal insulation to ensure optimal energy efficiency. Following installation, our team commissioned the system, performing thorough testing and verification to ensure all plant and equipment were fully operational and compliant with performance standards

Our in-house engineers carried out the full installation and commissioning of each system including:
• 2x Bosch GC7000WP 125KW condensing heating boilers and complete cascade system c/w boiler shunt pumps, frame and insulation header.
• New individual flue systems.
• New weather seals to roof.
• Bosch cascade boiler controller unit with connection to existing BMS.
• Replacement heating, gas and water pipework to suit new boilers.
• Thermal insulation.
• Electrical supplies where required to new plant.
• Test and commission plant & equipment including water treatment

The flush out point. Their will be new T connection from blue pipe to bottom left corner.

PROJECT GALLERY

RELATED CASE STUDIES

Amey Community Ltd – HMP

Amey Community Ltd – HMP

CASE STUDIES Project details Client: Amey Community Ltd Site HMP  Location: Staffordshire Services: Heating Upgrade OUR CLIENT Our client operates a secure custodial facility where reliable heating and essential building services are vital to maintaining a safe,...

The De Ferrers Academy

The De Ferrers Academy

CASE STUDIES Project details Client: Affinity Learning Partnership Site De Ferrers Academy, Trent Campus Location: Burton, Staffordshire Services: HeatingOUR CLIENT Affinity Learning Partnership is a mixed multi-academy trust operating across Staffordshire and...

Sun Academy

Sun Academy

CASE STUDIES Project details Client: Academy Transformation Trust Site Sun Academy Location: Newcastle-under-Lyme Services: Heating Boiler ReplacementOUR CLIENT Our client, The Academy Transformation Trust, knows that providing the very best education for their...

Contact Us

We’d love to chat with you.

Fill in the form below and one of our dedicated team members will get in touch.