Project details
Client: Amey – Birmingham & Solihull Mental Health Facilities Trust
Site: Ashcroft Unit
Sector: Healthcare
Location: Birmingham
Duration: 3 weeks
Services: Mechanical services
OUR CLIENT
Amey’s Birmingham and Solihull Mental Health NHS Foundation Trust provides a comprehensive mental healthcare service with a range of specialist mental health services to communities that span the West Midlands. The Trust serves a culturally and socially diverse population of 1.3 million spread over 172 square miles. Ashcroft Unit provides mental health services as part of the Trust.
THE BRIEFING
The scope of work to be completed by Ford Mainwaring included the following:
- Separate the Main Cold Water (MCWS) Supply from the existing Cold Water Storage Tank (CWST) and drain the water.
- Disconnect the connection points including overflow and early warning.
- Disconnect the pipes for MCWS and Temperature Controlled Water System and remove them until they reach local valves that can be closed.
- De-commission and remove tank from the site for proper disposal.
- Install a new sectional GRP (Glass Reinforced Plastic) CWST to replace the old tank.
- Set up a tank divider in the new tank, similar to the previous tank, which will include two chambers with ball valves.
- Make any necessary modifications to the piping, connecting the new tank to the existing pipes.
- Refill the tank with water and ensure it is functioning correctly.
- Treat the water in the tank with chlorine and neutralizing agents before putting it into use. Take a water sample for testing, and once it meets the required standards, issue a certification.
IN THE END
Dean Cockburn from Ashcroft Unit gave us the following feedback regarding the tank installations;
“Brilliant job from start to finish from all the team involved at Ford Mainwaring. Being able to maintain the cold water supply to the building appeared a challenge to the site but through the installation of the mains bypass there was little to no downtime at all. Great levels of communication throughout the project at all times and handed over to site on time with the project programme. Extremely happy with the finished job & look forward to working with Ford Mainwaring again.”
If you require a skilled engineer for work in your educational setting, all Ford Mainwaring staff are fully DBS and CTC vetted, so you can know your facility is in safe hands. Contact us to book a free consultation for your mechanical and electrical installation and maintenance work.

RELATED CASE STUDIES
St Luke’s Church, Silverdale
CASE STUDIES Project details Client: St Lukes Church, Silverdale Location: Silverdale, Newcastle under Lyme Services: HeatingOUR CLIENT St Luke’s Church is a Church of England parish located in the village of Silverdale, Newcastle-under-Lyme. It plays a central role...
The De Ferrers Academy
CASE STUDIES Project details Client: The De Ferrers Academy Site: Trent Campus Location: Burton, Staffordshire Sector: Education Services: HeatingOUR CLIENT Our client, The De Ferrers Academy, is amongst the top 20 largest schools in England and the largest school in...
Holly Lodge School – Replacement Heating System
CASE STUDIES Project details Client: Mitie FM LTD Site: Holly Lodge School, Smethwick Location: Smethwick, Birmingham Sector: Education Services: HeatingOUR CLIENT Mitie FM Ltd is the UK’s leading facilities management and professional services company, delivering...
Contact Us
We’d love to chat with you.
Fill in the form below and one of our dedicated team members will get in touch.