Project details
Client: Edina UK Ltd
Sector: Industrial
Location: Sonoco Recycling, Halifax
Duration: 6 months
Services: Electrical
OUR CLIENT
Edina UK Ltd is a leading power generation specialist and EPC solutions provider for the engineering, installation and maintenance of gas-fired distributed power plants, standby mission critical generation, and battery energy storage systems.
THE BRIEF
Our team of electrical engineers attended the Sonoco Recycling plant to run the energy centre that houses the combined heat and power plant & steam package boiler, located in Halifax. The plant comprises of a purpose-built energy centre to house the MWM TCG 2032 V12 3.2MWe genset, boiler and its ancillaries. The plant is fuelled from the site’s natural gas facility.
Scope of work:
-
LV cabling design
-
Lighting & emergency lighting design
- Primary containment systems
- Secondary containment systems
- HV, LV, and ELV cabling, including terminations and testing
- Ethernet cabling
- Gas detection system
- Fire alarm system
- Earthing and bonding
- Internal, external, and emergency lighting
- Small power
- Variable speed drives, isolators and control panels
- Inspection, testing and commissioning
IN THE END
When in operation, the CHP will generate enough electricity to power the factory, and any spare capacity will be exported and sold back to the national grid. As well as electricity, the CHP transfers heat to the new boiler, which converts into steam which is also used in the factory. Therefore, the factory is more energy efficient and environmentally friendly.
The cabling, gas detection, and fire alarm system installations contribute to enhanced safety measures and compliance with regulatory standards, ensuring the safety of personnel and equipment.
The HV, LV, and TLV cabling contribute to a reliable and robust electrical infrastructure. This ensures a consistent power supply to the energy centre, minimising downtime and disruptions.
The variable speed drives, isolators and control panels play a vital role in optimising energy consumption. They allow for better control and management of the plant’s operations, potentially leading to energy savings.
The work carried out by FML meets all current regulations and this was confirmed by a NICEIC assessment.
Following completion of the project, Edina commented, “Throughout the project, FM has been professional, accommodating, and the quality of work excellent”.
RELATED CASE STUDIES
St Luke’s Church, Silverdale
CASE STUDIES Project details Client: St Lukes Church, Silverdale Location: Silverdale, Newcastle under Lyme Services: HeatingOUR CLIENT St Luke’s Church is a Church of England parish located in the village of Silverdale, Newcastle-under-Lyme. It plays a central role...
The De Ferrers Academy
CASE STUDIES Project details Client: The De Ferrers Academy Site: Trent Campus Location: Burton, Staffordshire Sector: Education Services: HeatingOUR CLIENT Our client, The De Ferrers Academy, is amongst the top 20 largest schools in England and the largest school in...
Holly Lodge School – Replacement Heating System
CASE STUDIES Project details Client: Mitie FM LTD Site: Holly Lodge School, Smethwick Location: Smethwick, Birmingham Sector: Education Services: HeatingOUR CLIENT Mitie FM Ltd is the UK’s leading facilities management and professional services company, delivering...
Contact Us
We’d love to chat with you.
Fill in the form below and one of our dedicated team members will get in touch.